Monday 23 January 2012

Lavington Street Prefabricated Packaged Plantroom January 2012


Lavington Street
Prefabricated Plantroom

Constant Air Systems has successfully completed, delivered and installed another packaged plantroom.

With a footprint of 5m x 3.5m x 2.7 high CAS installed inside the plantroom:

  • 5no Boilers c/w vertical flues
  • Ventilation Louvres
  • 4no LTHW twin head pumps
  • 2no CHW twin head pumps
  • 1no Duel system pressurisation unit + Expansion vessels
  • Full pipework services fitout
  • 1no 65mm Air & Dirt Separator
  • 1no 35 Litre Dosing Pot
  • Free issue controls, lighting & small power
  • Factory fitted thermal insulation c/w isogenopak finish
  • Delivered and installed on site