M&S Cheshire Oaks Prefabricated Packaged Plantroom Gets The Lift For Delivery.
Our Prefabricated Packaged Plantroom for Marks & Spencer Cheshire Oaks finally left our factory this afternoon after being lifted onto a flatbed lorry for delivery.
Pictures showing inside the factory of the plantroom on its way outside and also pictures of the lift itself onto the lorry.
Marks & Spencers still have there Biomass PPR waiting to be delivered which will be on here soon.
As you can see below the time and effort by all at Constant Air payed off with the measurements of the plantroom taken to the max. Our factory manager overlooked the plantroom movement as it was manovered though our factory door. With such little room for error either side.