Friday, 20 April 2012

Offsite Packaged Plantrooms by CAS ( Constant Air Systems )

Offsite Prefabricated Packaged Plantrooms
by
Constant Air Systems


CAS (Constant Air Systems) is one of the UK’s leading Offsite pre-fabricated packaged plant room manufacturers.


Offsite, Packaged Plant Solutions, Intergrated Plantrooms




Delivering entirely bespoke systems for a wide range of buildings, pre-fabrication in a factory ensures all elements are tested in a controlled environment, reduces overall costs and minimises installation time on-site. Want a renewable system? Looking for something a bit different, such as sea water cooling? Need to combine a number of functions, including heating and air handling? With its team of mechanical, electrical and acoustic experts, CAS can provide a solution to suit the demands of almost any application. Founded in 1965, CAS is an independent company with over 45 years experience in the field of heating, ventilation and air conditioning. The business started manufacturing pre-fabricated plant rooms in 1986, initially for retail and then moving into the industrial sector. To date, CAS has successfully carried out contracts for motor, pharmaceutical and print companies, to name a few.

Plantroom Services, Boiler Packaged Plantroom

Pre-fabricated plant rooms are increasingly in demand; keeping costs down and time on-site to a minimum, plus by building and, importantly, testing the system before it’s installed, there are no hidden surprises.
Delivery of the finished plant room can be arranged at a time to suit the client’s build path; all systems arrive ready to be connected, with minimal effort. Architects, project managers, consultants and contractors are increasingly seeking out this approach, thanks to the benefits experienced at every stage of a project:


Costs
An independent analysis by BSRIA indicates a saving of 13.4% for a packaged plant system when compared with traditional construction. While this may not be true of every project, the statistic indicates what can be achieved. The same report also pointed to the improved productivity and reduction
in labour costs within a manufacturing environment.

Intergrated Plantrooms, Modular, HVCA, Plantroom Services
Involving a specialist manufacturer, such as CAS, in the very early stages of a development will maximise the potential savings available through the off-site approach.

Wednesday, 18 April 2012

M&S Cheshire Oaks HWS PPR Leaves Constant Air Systems

M&S Cheshire Oaks Prefabricated Packaged Plantroom Gets The Lift For Delivery.


Offsite, Offsite Plantroom, Intergrated Packaged Plantrooms, Containerised Plantrooms, Offsite Plant room, Offsite Modular Packaged Plantrooms

Our Prefabricated Packaged Plantroom for Marks & Spencer Cheshire Oaks finally left our factory this afternoon after being lifted onto a flatbed lorry for delivery.
Pictures showing inside the factory of the plantroom on its way outside and also pictures of the lift itself onto the lorry.
Marks & Spencers still have there Biomass PPR waiting to be delivered which will be on here soon.

offsite construction, Offsite intergrated packaged plantroom, HVCA, HVCA Plantrooms, Prefab, Prefab Plantrooms, offsite containerised
Intergrated Plantrooms, Offsite Containerised Plantrooms, Offsite, PPR, HVCA, HVCA Plantrooms, Boiler Plantrooms, HWS, Hot Water Services, Plantroom Services







offsite, Offsite HWS Plantroom, Boiler Plantroom, Marks and Spencer, M&S, Cheshire Oaks, M&S Cheshire Oaks, M&S Offsite, M&S Plantroom,Intergrated Plantroom, Intergrated PPR, Intergrated Packaged Plantroom, Integrated HWS Plantroom, Offsite Boiler Plant, Offsite Boiler HWS, Offsite Prefab Plant Room

Integrated Plantroom, PPR Offsite, Off Site PPR, Offsite containerised Plantroom, Offsite Prefab, Fabricated Plantroom, Packaged Offsite Plantrooms, Offsite Plantrooms,HVCA, Offsite HVCA,


Modular PPR. Modular Plantrooms, Containerised Plantrooms, Offsite, Offsite PPR, Offsite HVCA, HVCA, HVCA Offsite, Plant RoomsOffsite Plantrooms, Offsite, Integrated Packaged Plantroom Solutions, Packaged Plant Solutions, Offsite Prefab, CAS, Constant Air, Blog


Off Site M&S, M&S Offsite, M&S Packaged Plantroom. Marks & Spencer Plantroom. CAS Constant Air

Offsite, Modular, Containerised, PPR, M&S Plantroom

As you can see below the time and effort by all at Constant Air payed off with the measurements of the plantroom taken to the max. Our factory manager overlooked the plantroom movement as it was manovered though our factory door. With such little room for error either side.

Monday, 16 April 2012

CONSTRUCTION STARTS ON PARK ROYAL PREFABRICATED PACKAGED PLANTROOM

CONSTRUCTION STARTS ON PARK ROYAL PREFABRICATED PACKAGED PLANTROOM


The Park Royal  Packaged Plantroom is no small PPR, measuring 9.5m long X 4.1m wide X 3.1m high.

Included inside this plantroom CAS will be installing:-

  •  3no.off Floor standing boilers
  • 9 Single head circulating pumps
  • 2 LTHW twin head pumps
  • 2no.off CHW twin head pumps
  • 3no.off Pressurisation unit c/w expansion vessels












Middle Wallop Packaged Plant Room Making Progress

CONSTANT AIR SYSTEMS
PREFABRICATED PACKAGED PLANTROOMS

MIDDLE WALLOP
PROGESS
UPDATE



The Middle Wallop PPR construction is coming together nicely, as you can see by the photos alot of the equipment has already been installed and only a few more items of equipment need to be installed before the final pipework can be installed. The walls will soon be mounted and fixed onto the sides of the plantroom making it weatherproof.







Wednesday, 4 April 2012

NEQ Regents Place Prefabricated Plantroom

NEQ Regents Place
PPR




 After weeks of planning and construction the NEQ Regents Place PPR is nearing completion. With a few final tweeks our clients will soon be taking reciept of there prefabricated packaged plantroom.