Packaged Plantroom
This Plantroom is soon to be delivered to the Portsmouth Ferry Terminal on the back of a flatbed lorry to be positioned onsite ready for the final connections to be made. Commissioning has already be completed at our works in High Wycombe.
The equipment used in this Packaged Plantroom is:
- 2no.off Broag boilers Quinta 115's
- 1no.off Heat Exchanger
Pressurisation Unit Mikrofill model: EFD with a 200litre expansion vessel- Pump Sets
- 1no.off 300litre megaflow HE CL300