Monday, 11 March 2013

Martin Baker Packaged Plantroom Delivered

CONSTANT AIR SYSTEMS

MARCH 2013

MARTIN BAKER UPDATE



The Martin Baker PPR Has been Completed and has been delivered to site. These photos are of the Packaged Plantroom inside CAS Works just before being loaded onto the lorry for delivery.



Another Quality Packaged Plantroom By Constant Air Systems.

Wednesday, 30 January 2013

Martin Baker PPR January 2013


Progress of Martin Baker PPR

Constant Air Systems are delighted to construct another Prefabricated Plant-room  which shall be delivered within Oxfordshire.
Constant Air Systems worked hand in hand with the consultants to ensure that the customer was guaranteed the perfect product. 


















This Prefabricated Plant-room is fitted with;
        • A 6Litre Dosing Pot
        • An Electric Boiler
        • Thermal Insulation Has Been Applied
        • Magna 3 D40-80F                           Duty: 1.36 l/s @15kPa
        • Magna 3 D40-80F                           Duty: 0.552 l/s @45kPa
        • 80 Litre Horizontal Expansion Vessel
        • An Impress Standard Twin Pump Pressurisation Unit along with Commissioning
        • A Single Door
        • 500wide x 500high External Weather Louvre
        • 500wide x 250high External Weather Louvre