Friday, 6 May 2011

Carnaby Street

Carnaby Street
Prefabricated Packaged Plantroom

Here is Carnaby Streets completed Packaged Plant room. Measuring 2.5 x 2.0 x 2.4 meters high.
Inside the LTHW Plantroom we have installed
2no.off Wall Hung Boilers c/w Flue System
1no.off Twin Head Pump
Type: Tped 32-120/2 (0.37kW)
All Relevant Pipe Services and Insulation
Preliminaries, Design Development & Site Delivery
All of this in a construction time of just 6-8 weeks.

Final commissioning due to be completed once positioning on site has been finalised.











Tuesday, 29 March 2011

March 2011

Packaged Biomass Boiler
Plantroom

Inverness Primary School

Our Services were required to manufacture, supply, deliver & re-assemble a Packaged Biomass Plantroom on-site at the Inverness Primary School in Scotland.

The plantroom dimensions are 14 x 4 x 4.1 meter high which also includes the pellet fuel store.
This is a Photo inside the pellet store.

Rain water guttering & down pipes fitted to the plantroom on site.

300kW Biomass Boiler accumulators, fuel feed system, augers and transport tubes.


Internal Plant and pipe services included in the Plantroom were:
  • buffer tank and control software
  • Boiler & fuel feed wiring
  • Individual boiler heat meters
  • Flue system
  • 3,000litre buffer vessel c/w thermal insulation jacket
  • Pumps, Pressurisation Unit, 500litre expansion vessel & commissioning
  • Factory applied pipe services thermal insulation
  • Electrical services, lighting/emergency & small power requirements
  • Preliminaries, design development, delivery to site & site assembly