Marble Arch PPR, Constant Air Systems March 19th 2013

Marble Arch


Marble Arch PPR 

Constant Air Systems Progress

More information below







Equipment

  • 3 No. Off Wessex ModuMax 120/320c condensing boiler fully modulation. Fully automatic with Volt free contacts. Duty; 360kW output @ 50/30 Degrees.
  • 3 No. Off Wessex ModuMax factory tested manifold kit, complete with valves.
  • 3 No. Off CWH90/300 high effeciency stainless steel storage water heater.
  • A vertical Flue kit
  • 2 No. Off Single head inline pump with integral inverter. 1.5kW 4 Pole Motor 3x 400V 50Hz to meet the duty of; 171/s @ 66kPa
  • 2 No. Off Sensor kit DPI 0-1.0 Bar
  • 2 No. Off Single head inline pump with integral inverter. 4kW 4 Pole Motor 3x 400V 50Hz to meet the duty of; 7.461/s @ 221kPa
  • 2 No. Off Sensor kit DPI 0-2.5 Bar
  • 2 No. Off Single head inline pump with integral inverter. 3kW 4 Pole Motor 3x 400V 50Hz to meet the duty of; 6.21/s @ 221kPa
  • 2 No. Off Sensor kit DPI 0-2.5 Bar
  • 600Litre Expansion Vessel
  • 2x 6 Litre Dosing Pot
  • 100mm Combined Air and Dirt Seperator
  • High Level Louvre (1180mm Wide x 0.7mm High)
  • Low Level Louvre (1180mm Wide x 1.50mm High)






























Monday 11 March 2013

Tesco Newry Prefabricated Packaged Plantroom

TESCO NEWRY PPR


Tesco Newry PPR Completed and ready for Delivery.
On this post you will find photos of the finished Packaged Plantroom. Boilers, Water Heater, Booster Sets, Dosing Pot and Insulated Pipework










Martin Baker Packaged Plantroom Delivered

CONSTANT AIR SYSTEMS

MARCH 2013

MARTIN BAKER UPDATE



The Martin Baker PPR Has been Completed and has been delivered to site. These photos are of the Packaged Plantroom inside CAS Works just before being loaded onto the lorry for delivery.



Another Quality Packaged Plantroom By Constant Air Systems.