Monday 10 September 2012

Tesco Castle Reagh Prefabricated PPR - 10th September 2012



Tesco Castle Reagh
Prefabricated Packaged
Plant - Room



Tesco Castle Reagh


This packaged plant room has been finalised and packed ready for delivery. Within this plant room consists of; A water tank which consumes 3635 litres, Gas fired water heater, Pumps, Single pump booster set, Non electric water softener, Fan Heater and finally Ventilation Louvres. 

This plant room leaves Constant Air Systems later on today, where it will board a ferry to Ireland.

Not bad for design and construction in just 3weeks.


 








 

Tuesday 4 September 2012

Tesco Castle Reagh September 2012



Tesco Castle Reagh, Ireland
Prefabricated Offsite 
Packaged Plant Room

Constant Air Systems have accepted a challenge to design, manufacture and deliver a prefabricated packaged plantroom to Ireland on site in 4weeks or less. With this being such a tight period all the office staff were involved in procuring the equipment and checking delivery dates. then the manufacturing started on the skid framework. As soon as the equipment was delivered and offloaded off the lorry, it went straight to the plantroom to be installed by our installation team. With the factory at its busiest for a long time Constant Air still had room to fit one more Prefabricated Plantroom in.