Friday 16 December 2011

December 2011 YMCA Croydon



YMCA Croydon PPR

Constant Air Systems has successfully completed another prefabricated packaged plantroom.  Delivered to and installed on site and on time. Our plantroom consisted of:

  • Weatherproof enclosure 9.5m x 5.9m x 2.75 High
  • 2no.off Gas fired boilers 142kW each
  • Free issue CHP unit, Buffer Vessel & Ancillaries
  • 12no.off Circulating Pumps
  • LTHW Pressurisation unit c/w 500 litre expansion vessel
  • 6000 litre actual capacity cold water storage tank
  • 1no.off hot water calorifier 2500 litres capacity c/w unvented kit
  • 1no.off cold water booster set
  • Internal pipework installation
  • factory applied thermal insulation
  • Electrical services, lighting/emergancy & small power requirements
  • free issue control panel & Loose items
  • Preliminaries, design development, delivery to site & re assembly