Friday, 17 February 2012

Epson School PPR February 2012

Epson School
PPR
February 2012

We are currently manufacturing a prefabricated packaged plantroom for epson school. The plantroom is
4.0m x 3.0m x 2.7meters high.
3no.off Gas boilers each rated @ 300kW c/w flues
Circulating pump
Pressurisation Unit and 2no.off 400litre expansion vessels
100mm dia Air and Dirt separator
Factory applied thermal insulation
Electrical installations of controls, lighting/electrical lighting & small power
Control system, panel, loose controls, commissioning & demo
Preliminaries, design development, delivery to site & offloading


3no.off Gas fired floor mounted condensing boilers rated @ 300kW each


1no.off 100mm Combined air and dirt separator


View from behind the Eurocondense three's



Chesterford Science Village February 2012

CHESTERFORD SCIENCE
VILLAGE PPR'S
LATEST



 Chesterford Science Village prefabricated packaged plantrooms totalled 17. with a minimal footprint Constant Air Systems designed and developed a scheme in which we could install all of the equipment our client required in the smallest space possible. With a small installation period CAS moved quickly to procure all of the equipment and get the delivery dates to be as short as possible with this achieved we set about the installation of the equipment.


 Photo of Skid just been delivered measuring 1800mm W x 600mm D x 2200mm H

 Final 8no skids ready for installation

 1st batch of units progressing well
 Close up view of single unit

Day 7 of first batch of skids 

 Photo of single unit on day 5 of installation
 Pump installed