December 2011 YMCA Croydon



YMCA Croydon PPR

Constant Air Systems has successfully completed another prefabricated packaged plantroom.  Delivered to and installed on site and on time. Our plantroom consisted of:

  • Weatherproof enclosure 9.5m x 5.9m x 2.75 High
  • 2no.off Gas fired boilers 142kW each
  • Free issue CHP unit, Buffer Vessel & Ancillaries
  • 12no.off Circulating Pumps
  • LTHW Pressurisation unit c/w 500 litre expansion vessel
  • 6000 litre actual capacity cold water storage tank
  • 1no.off hot water calorifier 2500 litres capacity c/w unvented kit
  • 1no.off cold water booster set
  • Internal pipework installation
  • factory applied thermal insulation
  • Electrical services, lighting/emergancy & small power requirements
  • free issue control panel & Loose items
  • Preliminaries, design development, delivery to site & re assembly