BAE Barrow in Furness July 2011

BAE Systems
Barrow in Furness
Prefabricated Plantroom


  • Weatherproof enclosure 2.75 x 2.2 x 2.7 meters high
  • 2no.off gas fired boilers Quintas pro's
  • Boiler flue systems & combustion louvres
  • 2no.off LTHW circulation pumps single head as duty/standby
  • Pressurisation Unit complete with expansion vessel
  • All pipework installation fitout (including supply of 50mm dia GSV)
  • Factory supplied pipe services thermal insulation
  • Electrical services, Lighting/emergency & small power requirements
  • Electrical wiring installation of free issue control panel & losse controls
  • Preliminaries, design development & delivery to site via Hiab lorry.