YMCA Croydon PPR
Constant Air Systems has successfully completed another prefabricated packaged plantroom. Delivered to and installed on site and on time. Our plantroom consisted of:
- Weatherproof enclosure 9.5m x 5.9m x 2.75 High
- 2no.off Gas fired boilers 142kW each
- Free issue CHP unit, Buffer Vessel & Ancillaries
- 12no.off Circulating Pumps
- LTHW Pressurisation unit c/w 500 litre expansion vessel
- 6000 litre actual capacity cold water storage tank
- 1no.off hot water calorifier 2500 litres capacity c/w unvented kit
- 1no.off cold water booster set
- Internal pipework installation
- factory applied thermal insulation
- Electrical services, lighting/emergancy & small power requirements
- free issue control panel & Loose items
- Preliminaries, design development, delivery to site & re assembly